CITIC Telecom CPC Baltic• 2 landing points
Status Legend
Operational
Fault
Degraded
Maintenance
Landing Station
Status & Statistics
0/1
Active Segments
0
Degraded
1
Down
Fault
Current Status
350 km
Length
8 Tbps
Capacity
2
Landing Points
Segments (1)
| Segment | Route | Length | Capacity | Status | ETA | ||
|---|---|---|---|---|---|---|---|
Estonia-Sweden trunk | Tallinn CLSStockholm CLS | — | — | Down | — | ||
Status since:Dec 28, 2024 Affected Capacity 100% Fault location: Estonia-Sweden segment severed on December 28, 2024. Suspected sabotage/hybrid warfare during Baltic Sea incidents. Investigation ongoing. Full outage - 100% capacity affected. | |||||||
Network Topology
Click on a node or segment to view details
Legend
Landing Station
Branching Unit
Active
Down
Degraded
Maintenance
Ownership
CITIC Telecom CPCPrimary
100.00%Landing Points (2)
1
Tallinn CLS
Tallinn, EE
2
Stockholm CLS
Stockholm, SE
2 landing points connected
350 km total lengthOutage History
No Outage History
This cable system has no recorded outages
